Solar Interconnection Queue Dataset

All solar-bearing interconnection-queue project rows in Berkeley Lab and GridTracker’s 2026 Queued Up edition, covering requests through the end of 2025. Includes active, withdrawn, suspended and operational statuses.Edition 2026.09.05.5126f43694cf, prepared 2026-09-05. 18,108 records in CSV and JSONL, with schema, sample, included source material, provenance and SHA-256 checksums.One-time fixed download; no recurring service. Attribution: Lawrence Berkeley National Laboratory and GridTracker, Queued Up 2026, CC BY 4.0. This is transmission-generation queue coverage, not rooftop, distribution, load or behind-the-meter connections. Queue entries do not guarantee projects will be built.